Home > Application
300,000Nm³ per day sulfur removal project
300,000Nm³ per day dehydration project
This project involves a 60,000 m³ LNG liquefaction plant. Considering the high sand and dust levels at the project site, the gas generator sets are equipped with dust-proof enclosures to ensure stable operation in sandy environments. The units a...
150,000Nm³ per day dehydration project
400,000Nm³ per day acid removal project
Sulfur Recovery and Tail Gas Treatment Project
10Nm³ per day LNG project
Project Introduction:10×1000KW silent-type natural gas generator sets.Equiped with silent-type containers.The project is running normally.
Project Introduction:15×1,200KW silent-type natural gas generator sets.Equipped with silent-type containers.The project is running normally.
Project Introduction:12 sets of 1200KW silent natural gas generator sets;Equipped with silent-type containers;The project is running normally.
Project Introduction:18×1200KW silent-type natural gas generator setsEquipped with silent-type containersThe project is running normally.
Project Introduction:10×1000KW silent-type natural gas generator sets.Equipped with silent-type containers.The project is running normally.
Copyright © Sichuan RongTeng Automation Equipment Co., Ltd. — Privacy Policy