This project involves a 60,000 m³ LNG liquefaction plant. Considering the high sand and dust levels at the project site, the gas generator sets are equipped with dust-proof enclosures to ensure stable operation in sandy environments. The units a...
This project involves a 60,000 m³ LNG liquefaction plant. Considering the high sand and dust levels at the project site, the gas generator sets are equipped with dust-proof enclosures to ensure stable operation in sandy environments. The units are fitted with a flue gas waste heat recovery system, which is used for heating the station with a designed heating area of 220 square meters.
Project Configuration: Three 1000kW dust-proof gas generator sets + one set of flue gas heat exchange equipment.
Gas Pressure: 0.4~0.6MPa